Cart 0
Compare 0 Wishlist 0
My Account
Menu
Our address: Main Buildings at 102 E. Railroad Ave., Knoxville, PA 16928
Main Buildings at 102 E. Railroad Ave., Knoxville, PA 16928
Phones: +15704046968
$ 4 750

Double manual decoiler machine SS4E-DMDC

Product Code: SS4E-DMDC
In Stock
$ 4 750
Ex Tax: $ 4 750

Max coil: weight 2 x 3000lbs , width 26.5", ID 16-20"

Manual Decoiler SS4E-DMDC designed to hold and unreel coiled materials.

Maximum weight of each coil is 3000 lbs.  Width is up to 27 inches / 670mm.

Decoiler can be used to uncoil metal, plastic, paper and other materials.

Self Centering arbor reel made of aluminum is easy to install and fix inside of the coil and set on the stand.

Decoiler consist of three main parts:  2pc of Expandable Arbor reel and Free Standing double reel stand.

Self Centering arbor reel made of aluminum is easy to install and fix inside of the coil and set on the stand.

Arbors made with three ranges of coil ID with pin selector and flexible screw to tighten it inside of the various coil ID sizes in range of  16” to 20” ID. Each arbor capacity is 3,000 lbs.

Stand of the free Standing Manual Double Decoiler  Made of powder coated steel. Has two spots for the arbor reels with friction brakes and clamps to secure arbors in place while operation.
The EXA (
Expandable Arbor Reel) can be sold separately 1.750$ for fast material change or to fit on other roll-forming machines.


Technical parameters
Range of the Inside coil diameter

16 - 20 inches / 400 - 500 mm

13 - 24 inches optional*

Maximum weight 3 000 lb / 1400 kg
Maximum coil width 26.5 inches / 670 mm
Size, LхWхH* 24x34x42 inches / 610х860х1070mm
Weight* 400lbs / 190kg

LOADING EXPANDABLE ARBORS WITH COIL

1. Using the Threaded Nut, collapse the arbor small enough to fit into the inside diameter of the coil. 
2. Slide the Expandable Arbor into the center of the coil. 
3. Turn the Threaded Nut clockwise until the Support Bars on the arbor are just snug against the inside of the coil. 
4. Finish by rotating the Threaded Nut clockwise until the Support Bars are very tight against the inside of the coil.  Verify that material is in proper alignment with machine.  The Coil and Arbor are now ready for loading.  

LOADING REELED COIL 
 Caution:  Always use a forklift or other approved lifting device to load or unload reels and coils.          
1. Prepare the reel stand by making sure the Hold Down Brackets are in the unlocked and open  Position. 
2. Using an approved lifting device, lift the reeled coil into the cradles on the reel stand making sure that the tail of the coil is in the correct position for the profile you are running, then remove the lifting device. 
3. Rotate the Hold Down Brackets to the closed position and thread the handle onto the hold down bolt.  If you are going to run panel from this coil, tighten the left and right handle just snug.  Final adjustment of tension should be made while running a panel to keep reel from unwinding material to fast.  As the coil becomes smaller, re-adjustment may need to be made.  Caution: DO NOT over tighten Hold Down Brackets.  Drive and/ or Electrical System Failure may occur. 
4. If you are going to transport the machine after loading coil, tighten the Hold Down Brackets securely to keep coil from unwinding during transport, and secure the loose end of the material to the coil. 
5. Before transporting the loaded Expandable Arbor, you should also secure the coil around the outside edges through the inside diameter using a strap, rope, etc to prevent the coil from telescoping.
NOTE: Make sure Hold Down Brackets are tightened securely and coil is properly tied off before transporting machine.

Reviews
0/ 5
average product rating
0
0
0
0
0
There are no reviews for this product. Be the first to leave your review.
Related Products